Hyperscale AI Power Infrastructure
Powering AI
at Scale
We develop and own purpose-built power infrastructure for hyperscale AI data centers. Behind-the-meter generation. Multi-source reliability. Built for the demands of tomorrow.
>10
GW in Development
100%
Behind the Meter
6
Energy Sources
60+
kW/Rack Density
Flagship Project
The Delta Gigasite
Our first project proves our model works. 1,143 acres in Delta, Utah. Land secured, permits issued, construction underway.
1,143
Acres Owned
>10 GW
Power Capacity
6 GW
Solar Development
Land
CompleteFee Simple Ownership
- • 1,143 acres owned outright
- • 10 contiguous parcels
- • Phase I Environmental Assessment complete
Permits
CompleteZoning & Use Approved
- • Heavy Industrial (HI) zoning approved
- • C-2 Conditional Use Permit issued
- • Data center + generation authorized
- • Zoning approved for solar
Natural Gas
Under ConstructionGas Interconnect
- • Interconnect Agreement executed
- • 43,000 Dth/day initial capacity
Solar
ExecutedSITLA Land Lease
- • Largest solar lease in Utah's history under contract
Engineering
CompleteGeotechnical Investigation
- • 300+ soil borings completed
- • Seismic Category C confirmed
- • Infrastructure feasibility complete
Equipment
On SiteTorus Load Smoothing
- • Torus advanced storage solution installed December 2025
- • Grid-forming battery backup
- • Flywheel inertia for stability
Energy Foundation
Multi-Source Reliability
Behind-the-meter generation independent of grid constraints. Diversified fuel sources with contracted supply ensure the reliability AI workloads demand.
Natural Gas
Gas interconnect executed. 29 engines via Quanta Services.
Solar
Over 13,000 acres SITLA land under lease. ~29% capacity factor.
Fossil
Adjacent to Intermountain Power Project. 345kV private transmission.
Storage
Torus battery/flywheel systems on site. Propane peaking from Sawtooth caverns.
Gas
Solar
IPP
Other
>10
Total GW
100%
Behind the Meter
Our Approach
Why Creekstone
We solve the power problem that's holding back AI infrastructure deployment.
Behind the Meter
Independent of grid constraints. Power where you need it, when you need it.
Multi-Source Reliability
Diversified generation ensures uptime. Gas, solar, storage working together.
Speed to Power
Deploy hundreds of megawatts of IT load in less than 18 months. Equipment ordered, construction underway.
Community First
Dark sky compliance. Local economic impact.
Execution
Contracted Partners
Every critical path has a named contractor with signed commitments or executed agreements.
Quanta Services / Dashiell
Substation EPC
Transformer and switchgear in production. Q2 2027 completion.
NAES Corporation
Operations & Maintenance
Exclusive O&M partner for power plant operations. MOU executed.
Torus
Grid Stability
Advanced storage solution installed on site December 2025.
Ramboll
Environmental
Air permitting engineering and modeling for generation facilities.
Clayco / Cobalt
Architecture
Campus test fit complete. Master plan for 4-zone development.
CMT Technical Services
Engineering
Geotechnical engineering, ALTA surveys, Phase I ESA. 300+ borings complete.
Integra Mission Critical
Data Center Design
Powered shell design. Near-zero water cooling architecture.
Partner With Us
Building the Power Behind AI
Whether you're a hyperscaler looking for power, a community member with questions, or an investor exploring opportunities, we'd like to hear from you.