Flagship Project
The Delta Gigasite
>10 GW AI infrastructure campus in Delta, Utah. Land secured, permits issued, construction underway.
1,143
Acres Owned
>10 GW
Power Capacity
Active
Construction
Every milestone represents capital deployed, contracts executed, and deadlines met, not future promises or conditional commitments. Creekstone is building the largest data center campus in the world, enabling leadership in the race to AI superintelligence.
Progress Report
Milestones Achieved
Land
CompleteFee Simple Ownership
- • 1,143 acres owned outright
- • 10 contiguous parcels
- • Phase I Environmental Assessment complete, no RECs identified
Permits
CompleteZoning & Use Approved
- • Heavy Industrial (HI) zoning, approved June 5, 2025
- • C-2 Conditional Use Permit, approved July 1, 2025
- • Data center + electrical generation facility authorized
- • Zoning approved for solar
- • Air permits in final modeling with Ramboll
Natural Gas
Under ConstructionGas Interconnect
- • Interconnect Agreement executed, September 2025
- • 43,000 Dth/day initial capacity (230 MW)
Solar
ExecutedSITLA Land Lease
- • Largest solar lease in Utah's history under contract
Engineering
CompleteGeotechnical Investigation
- • 300+ soil borings completed by CMT
- • Water, sewer, stormwater feasibility in progress
- • UDOT highway access documentation submitted
Equipment
On SiteTorus Load Smoothing
- • Concrete equipment pad placed
- • Torus advanced storage solution installed, December 29, 2025
- • Grid-forming battery backup for generation
- • Flywheel inertia for grid stability
Infrastructure
Designed for AI Scale
Purpose-built for AI clusters, not legacy servers. Every specification anticipates 2030 workloads.
Phase 1 Capacity
220 MW
Campus Size
>10,000
Acres
Cooling
Dry
Essentially waterless operation
Elevation
4,600 ft
High desert cooling advantage
Full Build
>10 GW
Campus electrical capacity
Energy Foundation
Multi-Source Power
Behind-the-meter generation independent of grid constraints. Diversified fuel sources with contracted supply.
Natural Gas
Gas interconnect executed. 29 engines via Quanta Services. 9-month lead time from order.
Solar
30,000 acres SITLA land under lease and option. 5 acres/MW at Delta latitude. ~29% capacity factor.
Fossil
Adjacent to Intermountain Power Project. 345kV private transmission. Legislative process for acquisition in progress.
Storage
Torus battery/flywheel systems on site. Propane peaking from Sawtooth caverns.
Gas
Solar
Fossil
Other
>10
Total GW
100%
Behind the Meter
Connectivity
Over 20 Fiber Routes
Delta sits at the crossroads of major regional data transmission routes, enabling low-latency connections across the Western United States.
On-Net Carriers
- CenturyLink / Lumen
- AT&T
- Cogent
- Hurricane Electric
- Level 3
- Zayo
Additional Access
- Comcast
- Verizon
- Sprint
- Syringa
- Centracom
- +14 within 28 miles
Carrier-neutral facility with 100G/400G ready infrastructure.