Delta Gigasite aerial view at sunrise

Flagship Project

The Delta Gigasite

>10 GW AI infrastructure campus in Delta, Utah. Land secured, permits issued, construction underway.

1,143

Acres Owned

>10 GW

Power Capacity

Active

Construction

Every milestone represents capital deployed, contracts executed, and deadlines met, not future promises or conditional commitments. Creekstone is building the largest data center campus in the world, enabling leadership in the race to AI superintelligence.

Progress Report

Milestones Achieved

Land

Complete

Fee Simple Ownership

  • • 1,143 acres owned outright
  • • 10 contiguous parcels
  • • Phase I Environmental Assessment complete, no RECs identified

Permits

Complete

Zoning & Use Approved

  • • Heavy Industrial (HI) zoning, approved June 5, 2025
  • • C-2 Conditional Use Permit, approved July 1, 2025
  • • Data center + electrical generation facility authorized
  • • Zoning approved for solar
  • • Air permits in final modeling with Ramboll

Natural Gas

Under Construction

Gas Interconnect

  • • Interconnect Agreement executed, September 2025
  • • 43,000 Dth/day initial capacity (230 MW)

Solar

Executed

SITLA Land Lease

  • • Largest solar lease in Utah's history under contract

Engineering

Complete

Geotechnical Investigation

  • • 300+ soil borings completed by CMT
  • • Water, sewer, stormwater feasibility in progress
  • • UDOT highway access documentation submitted

Equipment

On Site

Torus Load Smoothing

  • • Concrete equipment pad placed
  • • Torus advanced storage solution installed, December 29, 2025
  • • Grid-forming battery backup for generation
  • • Flywheel inertia for grid stability

Infrastructure

Designed for AI Scale

Purpose-built for AI clusters, not legacy servers. Every specification anticipates 2030 workloads.

Phase 1 Capacity

220 MW

Campus Size

>10,000

Acres

Cooling

Dry

Essentially waterless operation

Elevation

4,600 ft

High desert cooling advantage

Full Build

>10 GW

Campus electrical capacity

Energy Foundation

Multi-Source Power

Behind-the-meter generation independent of grid constraints. Diversified fuel sources with contracted supply.

Natural Gas

Gas interconnect executed. 29 engines via Quanta Services. 9-month lead time from order.

Solar

30,000 acres SITLA land under lease and option. 5 acres/MW at Delta latitude. ~29% capacity factor.

Fossil

Adjacent to Intermountain Power Project. 345kV private transmission. Legislative process for acquisition in progress.

Storage

Torus battery/flywheel systems on site. Propane peaking from Sawtooth caverns.

Gas

Solar

Fossil

Other

>10

Total GW

100%

Behind the Meter

Connectivity

Over 20 Fiber Routes

Delta sits at the crossroads of major regional data transmission routes, enabling low-latency connections across the Western United States.

On-Net Carriers

  • CenturyLink / Lumen
  • AT&T
  • Cogent
  • Hurricane Electric
  • Level 3
  • Zayo

Additional Access

  • Comcast
  • Verizon
  • Sprint
  • Syringa
  • Centracom
  • +14 within 28 miles

Carrier-neutral facility with 100G/400G ready infrastructure.

Northern Utah fiber routes showing Delta at the intersection of major carriers

Request a Site Tour