Interconnect Agreement Executed · Meter Station Under Construction

ENERGY
FOUNDATION.

Behind-the-meter generation independent of grid constraints. >10 GW from diversified, contracted sources.

Power Stack

CONTRACTED CAPACITY.

2.1

GW Natural Gas

Gas interconnect executed. Engines via Quanta.

6

GW Solar

30,000 acres SITLA land. Lease and option executed.

1.8

GW IPP

Adjacent to Intermountain Power Project. 345kV private transmission.

1

GW Storage/Other

Torus battery/flywheel systems on site. Propane peaking from nearby storage.

>10 GW

Total Power Stack

100%

Behind the Meter

0

Grid Dependency

Natural Gas

GAS
INTERCONNECT.

Interconnect Agreement executed September 2025. Construction underway.

Initial Capacity

43,000 Dth/day

230 MW from 29 natural gas engines

Natural gas pipeline infrastructure
Interconnect Agreement Executed Sept 2025
Precedent Agreement Executed Sept 2025
Design Pressure 650-1,333 psig
Engine Delivery 9 months from order
Engine Supplier Quanta Services
Utility-scale solar installation
SITLA Lease Executed Nov 2025
Phase 1 Lease 2,758 acres
Option Acreage 6,180 acres
Total Adjacent Land 30,000+ acres
Capacity Factor ~29% (Utah avg)

Solar

30,000 ACRES
SOLAR-READY.

Adjacent SITLA land under lease and option. Off-grid commercial solar generation co-located with compute.

Phase 1

2 GW Nameplate

10,000 acres at 5 acres/MW (Delta latitude)

Full Build

6 GW Nameplate

30,000 acres. ~1.7 GW average delivery at 29% CF.

Integration

Gas + Solar Hybrid

Solar offsets daytime gas consumption. Gas allocation shifts to evening. Propane peaking for winter variability.

Additional Sources

IPP & BEYOND.

Intermountain Power Project

1.8 GW

Adjacent to IPP. 345kV private transmission line. Legislative acquisition process underway via Utah Decommissioned Asset Disposition Authority.

  • • Two 900 MW coal units
  • • NAES O&M partnership signed
  • • Wolverine Fuels MOU for Utah coal supply
  • • Enchant Energy carbon sequestration evaluation

Propane Peaking

Backup + Balancing

1.5 million barrels of propane storage near campus. Engines can run on propane.

  • • Trafigura storage agreement
  • • 20% blend with natural gas (1% efficiency loss)
  • • Pipeline from storage facility planned
  • • Rail access for replenishment

Grid Stability

TORUS
PARTNERSHIP.

Contracted for load smoothing and grid stability. Torus advanced storage solution installed on site December 29, 2025.

  • Concrete equipment pad placed on site
  • Torus advanced storage solution installed December 2025
  • Grid-forming battery backup
  • Flywheel inertia for generation stability
  • Millisecond response to grid signals

Torus Capabilities

System Type Torus Station
Inertia Torus Spin (flywheel)
Battery Storage Torus Pulse
Response Time Milliseconds
Uptime Target 99.9%

DISCUSS POWER REQUIREMENTS.

Power purchase agreements available. Custom ramp schedules. Review executed agreements under NDA.