Test Fit Complete · Clayco · Integra
INFRASTRUCTURE
SPECIFICATIONS.
Designed for 60kW AI clusters. Dry cooling. Tier III redundancy. Every specification anticipates 2030 workloads.
Campus Layout
1,143 ACRES. 4 ZONES.
Architectural test fit completed by Clayco, June 2025. Campus divided into four zones with dedicated substations per zone.
Campus 01
324 ac
600 MW facility capacity
Campus 02
181 ac
2.0 GW facility capacity
Campus 03
282 ac
1.4 GW facility capacity
Campus 04
300 ac
2.0 GW facility capacity
>10 GW
Total Facility Power
4.61 GW
HPC Compute Load
10
Parcels
Heavy Industrial
Zoning
Specifications
TECHNICAL PARAMETERS.
Power & Electrical
Cooling & Efficiency
Redundancy & Reliability
Site & Construction
Building Design
DATA HALL TEMPLATE.
Integra Mission Critical design. Standardized 90-100 MW data hall modules optimized for high-density AI compute.
Applications
WHAT YOU CAN BUILD.
Large Language Models
Train and iterate with dense 60kW clusters and high-bandwidth interconnect. Purpose-built for frontier model development.
Scientific Computing
Accelerate discovery in research workflows. Multi-GW scale for national laboratory-class workloads.
Inference at Scale
Serve billions of API calls with consistent latency. Western U.S. fiber connectivity.
Sovereign AI
Domestic infrastructure for national security workloads. Utah legislative support and community partnership.
REQUEST SPECIFICATIONS.
Full test fit documentation, site layouts, and engineering reports available under NDA.